Well we’ve nearly got all of the rotting pointing out. Just a little bit more of the apex to go. Tomoz we start filling in the huge voids with mortar. That vertical line of stone means something. Perhaps the left hand side was not there when originally built, or maybe the door was twice the width than it is now. The join does go all the way to the top though!
Pointing the Dairy.
Well it’s more digging out tons of concrete than pointing, but we are making progress. The mortar around the door is more like concrete and is tough as shit. This is how far progress has been made in about 3 hours work. The area between the two doors has been a lot easier, with the mortar here more like hard cheese. The pointing really wasn’t doing anything to stop the water going right through…
It’s D.I.Y Time.
A bit of a cockup on the pre work piccy front, but here’s what we managed to do in a couple of hours. Even without the pointing, it looks a 100 times better.
Search
Categories
- Astronomy (146)
- Away Breaks (3)
- Country Life (80)
- Food (4)
- Photography (31)
- Radio Astronomy (6)
Blog Archives
- ►2024 (11)
- ►2023 (20)
- ►2022 (21)
- ►2020 (9)
- ►2019 (3)
- ►2018 (8)
- ▼2017 (62)
- ►2016 (5)
- ►2015 (23)
- ►2014 (25)
- ►2013 (40)
- ►2012 (28)
- ►2011 (7)