Now the outside pointing on the dairy is finished, our attention turns to the inside.
![](https://i0.wp.com/nicktonkin.com/wp-content/uploads/2022/06/17-08-12-14-06-58-5090.jpg?resize=768%2C1024)
This is before we started removing most of the old soft concrete .
![](https://i0.wp.com/nicktonkin.com/wp-content/uploads/2022/06/17-08-12-3-38-32-pm-6620.jpg?resize=1024%2C768)
and after about an hours de-pointing. A long way to go yet, but at least I can work inside now when it’s pissing down outside.