We were supposed to have started work on the workshop over the Christmas break, but never seemed to get round to starting.  However, with New Year well out of the way and a little bit of settled weather, we got going. First in were the uprights. They  are bolted to the roof beams at the top and the wall at the bottom. With not a single flat or straight surface, all we had to…