Well it’s more digging out tons of concrete than pointing, but we are making progress.
The mortar around the door is more like concrete and is tough as shit. This is how far progress has been made in about 3 hours work.
The area between the two doors has been a lot easier, with the mortar here more like hard cheese. The pointing really wasn’t doing anything to stop the water going right through the walls and into the inside.